This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
me:diary:september:start [2016/09/18 12:57] Christian Ziruk |
me:diary:september:start [2016/09/18 13:05] (current) Christian Ziruk |
||
---|---|---|---|
Line 20: | Line 20: | ||
* Thursdays at 6:00 based on doodle poll? | * Thursdays at 6:00 based on doodle poll? | ||
- | ** Reflection** | + | |
===September 18th 2016=== | ===September 18th 2016=== | ||
- | Goals/ things to talk about | + | ** 19 DAYS UNTIL END OF 1st SPRINT** |
+ | |||
+ | Goals/ Discussion | ||
* Project Documents | * Project Documents | ||
Line 36: | Line 38: | ||
* Access to Desktop Fabrication room | * Access to Desktop Fabrication room | ||
* Project Requirement Meeting Time | * Project Requirement Meeting Time | ||
- | * Set meeting time with corresponding electrical team member about project details and requirements (MUST happen before design phase) | + | * Set meeting time with corresponding electrical team member about project details and requirements (MUST happen before design phase) |