This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
ee:power:start [2016/09/23 22:18] Brandon Kallaher [Table] |
ee:power:start [2016/09/28 23:27] Daniel Goto |
||
---|---|---|---|
Line 4: | Line 4: | ||
===== Overview ===== | ===== Overview ===== | ||
The power system within the submarine is divided into two sections: thruster power and bulkhead power. The power system must safely provide control and distribution of battery power to all systems in the submarine that require it. | The power system within the submarine is divided into two sections: thruster power and bulkhead power. The power system must safely provide control and distribution of battery power to all systems in the submarine that require it. | ||
+ | |||
+ | ===== Timeline ===== | ||
+ | - <del>Power Part Selection (September 26th)</del> | ||
+ | - PCB Schematic Completed (October 10th) | ||
+ | - Schematic Simulation (October 13th) | ||
+ | - PCB Part Selection and Footprint Association (October 15th) | ||
+ | - PCB Schematic and Part Review (October 17th) | ||
+ | - Board Routing Completed (November 10th) | ||
+ | - PCB Design Review (November 17th) | ||
+ | - Board Ordered (November 21st) | ||
+ | - PCB Populated (January 8th) | ||
===== Design ===== | ===== Design ===== | ||
Line 15: | Line 26: | ||
| {{http://www.ti.com/lit/ds/symlink/bq76200.pdf|BQ76200}} | LiPo Battery protection chip. | | | {{http://www.ti.com/lit/ds/symlink/bq76200.pdf|BQ76200}} | LiPo Battery protection chip. | | ||
| {{http://www.ti.com/lit/ug/slvu924c/slvu924c.pdf|BQ76920}} | LiPo active cell balancing chip. | | | {{http://www.ti.com/lit/ug/slvu924c/slvu924c.pdf|BQ76920}} | LiPo active cell balancing chip. | | ||
+ | |||
+ | |||
+ | ===== 9/26/2016 Deadline ===== | ||
+ | |||
+ | ^ Part ^ Part Number ^ | ||
+ | | Main Relay | LEV200A4NAF | | ||
+ | | Bulkhead Relay | ALFG2PF18 | | ||
+ | |||
+ | |||