User Tools


September

September 15th 2016

Goals

  • Project Briefing
    • Inertial Measurement Unit (IMU) Mount
    • Power Box Internals
    • Reed Switch Mount
    • ESC Mount
  • Wiki
    • What is the Wiki and how is it useful?
  • Grab Cad
    • Create Accounts
    • Walk through desktop application
    • Create folder for “October 7th Deadline”
  • Finalize weekly meeting time
    • Thursdays at 6:00 based on doodle poll?

September 18th 2016

19 DAYS UNTIL END OF 1st SPRINT

Goals/ Discussion

  • Project Documents
    • Create in word and place into Grab Cad folder
  • Tutorial Desicion
    • Drawings
    • Laser Cutter + Solidworks Configurations
    • 3D printing (STL and how to design for the printer)
  • FIZ
    • Tests for equipment
    • Access to Desktop Fabrication room
  • Project Requirement Meeting Time
    • Set meeting time with corresponding electrical team member about project details and requirements (MUST happen before design phase)